Case Studies

Kelway (UK) Ltd – Peterborough

KRB worked with the developer, Artisan (UK) Developments Ltd on the initial construction phase to deliver a scheme that achieved BREEAM Excellent, an industry benchmark for energy efficiency.

Find out more – Download the pdf.

Full Support Healthcare – Wellingborough

KRB provided a complete lighting design and installation service to meet the client’s specifications.

Find out more – Download the pdf.

Black Teknigas & Electro Controls – Eaton Socon

KRB provided a full electrical design and build service, working with the developer and the client to deliver a bespoke solution that catered for all their operational needs and minimised the disruption caused by the relocation.

Find out more – Download the pdf.